Skip to navigation
Skip to content
Skip to footer
Wentworth
Composite
Search
Menu
Site Navigation
Sports
Men's Sports
Baseball
Schedule
Roster
News
Basketball
Schedule
Roster
News
Cross Country
Schedule
Roster
News
Golf
Schedule
Roster
News
Ice Hockey
Schedule
Roster
News
Lacrosse
Schedule
Roster
News
Soccer
Schedule
Roster
News
Tennis
Schedule
Roster
News
Track & Field
Schedule
Roster
News
Volleyball
Schedule
Roster
News
Women's Sports
Basketball
Schedule
Roster
News
Cross Country
Schedule
Roster
News
Lacrosse
Schedule
Roster
News
Soccer
Schedule
Roster
News
Softball
Schedule
Roster
News
Volleyball
Schedule
Roster
News
Track & Field
Schedule
Roster
News
Inside Athletics
Staff Directory
Administrative Login
Athletic Disclosures Regarding Serious Misconduct
COF Intramurals
Composite Schedule
Directions
EADA Report
Go Leopards Front Row App
History and Tradition
Leopards Team Shop
Media Policies
NCAA Compliance
Name, Image & Likeness
SID Resources
Social Media Stream
Sports Medicine
Video: You Can Play
Why Wentworth?
Facilities
Nelson Recreation Center
Sweeney Field/Carr Diamond
Allied Veterans Memorial Rink
Store
Leopard Club
Hall Of Fame
Overview
Inductees
Nominations
WIT.EDU
Close
Men's Soccer Links
Team Home
Roster
Schedule/Results
Statistics
More+
News
Coaches
Archives
Pictures by SportsPix
Recruit Me
mobile
mail
facebook-fill
twitter
youtube
instagram
video
Sweeney Field Project
Workers rolling up a section of turf from the east goal area (05/14)
Sections of turf already torn up (05/14)
Workers began tearing up the AstroTurf on May 14 (05/14)
Looking towards the west goal area, workers have removed all of the turf and e-layer from Sweeney Field (05/21/12)
An overhead look at Carr Softball Diamond. In addition to removing the turf and e-layer, workers need to remove the dirt from the base cutouts (05/21/12)
A ground level look at the field, from the left field entrance to Carr Diamond (05/21/12)
A ground level look down left field, toward Huntington Avenue (05/21/12)
An overhead look at the midfield area (05/21/12)
Looking out towards Huntington Avenue from the top of the press box (05/21/12)
Workers prepare the east end of the field for drainage improvements (05/24)
Collectors' items? home plate and the pitching rubber from Carr Diamond (05/24)
Drainage improvements will include the backstop of Carr Diamond, here looking down towards the home (first base) dugout area (05/24)
Drainage improvements will include the backstop of Carr Diamond, here looking down towards the visiting (third base) dugout area (05/24)
Work continues on moving piles from the excavation along the west end (05/24)
Piles of crushed stone and dirt to be used to fill in the sub-layer of the field (05/24)
Rolls of new FieldTurf have been delivered and are set for installation (06/25)
The entire sub-surface was re-graded and additional stone added, where needed (06/25)
Installation of the new surface should begin within the next week (06/25)
Installation crews marked off where the sleeves should be drilled for the bases and pitcher's plate (06/25)
The dirt area under the press box overhang has been paved over, eliminating mudslides on the field after a rainstorm (06/25)
The first roll of turf is ready to be moved into position (06/26)
After 16 seasons of playing on an AstroTurf surface, Sweeney Field will switch to FieldTurf, which will benefit all of our programs (06/26)
A closeup of the first section of turf to be put down (06/26)
Workers move the turf into place so seams can be stitched together (06/26)
The first section of turf is being unrolled, beginning in the west goal area (06/26)
The laying of the new turf, which began this past Tuesday, is complete! (06/28)
The new surface extends onto Carr Diamond, which will be all turf (06/28)
With the new turf down, crews are scheduled to begin the infill process and stretch it to the perimeters on Friday (06/28)
Painting begins on the center circle (07/10)
The finished product, from field level (07/11)
The center circle (07/10)
Lines were painted for soccer and lacrosse. Softball lines will be painted in November, after soccer and fall lacrosse seasons end (07/11)
Once the center circle is completed, the inside will be black and will have the Wentworth shield in it (07/11)
Share
Facebook
Twitter
Email
Print